Post-construction deep clean of a new distribution centre
Client
Operator of a new-build distribution centre.
The challenge
A large new-build distribution centre needed a full post-construction clean before it could be handed over for fit-out and go-live. Construction dust and debris had to be cleared from a very large floor plate, the racking and the high-level steelwork, and it all had to be coordinated around the tail end of the build programme so the handover date held.
What we did
We brought in a team sized for the floor area and worked through the building from high level down, so finished areas stayed clean as we went.
- Full post-construction clean across a large floor plate
- High-level steelwork, services and racking cleaned down
- Construction dust and debris removed throughout
- Sequenced around the build programme to protect the handover date
The outcome
The building was cleared to a clean, handover-ready standard on schedule, ready for racking, fit-out and go-live.